Pages: [1] :: one page |
|
Author |
Thread Statistics | Show CCP posts - 0 post(s) |
Da Death
|
Posted - 2006.01.10 11:01:00 -
[1]
Edited by: Da Death on 10/01/2006 11:12:45
EDIT: Ok I found a ME calculator - nice one! at http://emp.eve-extra.com/bpcalc.php
now I need only a PE calculator pls :D
DD
--- old msg --- Is there anywhere a website / excel file / program file which I can use to calculate PE in advance? Since we can not stop out BPO's from research it very important to know what we get BEFORE :D
I really appreciate every hint
DD
- - Don't be a fool, be Relentless! Selling many BPC's and Tech2 stuff -check my bio :) |
Kalq Later
|
Posted - 2006.01.10 11:15:00 -
[2]
I need one too!
|
Dark Shikari
|
Posted - 2006.01.10 11:17:00 -
[3]
Max Waste = 0.2 * Build Time
Waste with PE = Max Waste / (PE + 1) -- Proud member of the [23].
The Tachikomas are DEAD! Click sig for video.
|
Kalq Later
|
Posted - 2006.01.10 11:26:00 -
[4]
Originally by: Dark Shikari
Max Waste = 0.2 * Build Time
Waste with PE = Max Waste / (PE + 1)
looks not logical, ME has nothing to do with build time
|
Da Death
|
Posted - 2006.01.10 11:31:00 -
[5]
I prefer a calcualtor because I not want to go through every item of my bpo for every hypothetical PE amount
Dark I not understand your formula
- - Don't be a fool, be Relentless! Selling many BPC's and Tech2 stuff -check my bio :) |
Dark Shikari
|
Posted - 2006.01.10 11:32:00 -
[6]
Originally by: Da Death
Dark I not understand your formula
1. Plug in numbers. 2. ??? 3. Profit! -- Proud member of the [23].
The Tachikomas are DEAD! Click sig for video.
|
Dark Shikari
|
Posted - 2006.01.10 11:32:00 -
[7]
Originally by: Kalq Later
Originally by: Dark Shikari
Max Waste = 0.2 * Build Time
Waste with PE = Max Waste / (PE + 1)
looks not logical, ME has nothing to do with build time
I never mentioned ME.
By "max waste" I mean "max wasted time." -- Proud member of the [23].
The Tachikomas are DEAD! Click sig for video.
|
Dark Shikari
|
Posted - 2006.01.10 11:33:00 -
[8]
Edited by: Dark Shikari on 10/01/2006 11:33:40
Wait, are you guys talking about Production Efficiency or Productivity Levels? My formula was for the PE Levels of a blueprint.
-- Proud member of the [23].
The Tachikomas are DEAD! Click sig for video.
|
Elissen
|
Posted - 2006.01.10 11:48:00 -
[9]
Edited by: Elissen on 10/01/2006 11:49:44 A buddy of mine found this formula a few weeks ago. Used it a few times now and it looks accurate to me.
ProductionTime = (1 - IndustryLvl * 0.04) * baseProductionTime * (1 - 0.2 * PE / (PE + 1))
Looks almost the same as the formula posted above. No time atm to really look at it to see if it is the same ---- ICSC Red Moon Rising edition: Jumpplanner tool - Routeplanner for all jumpcapable ships! |
Da Death
|
Posted - 2006.01.10 11:50:00 -
[10]
Originally by: Dark Shikari Edited by: Dark Shikari on 10/01/2006 11:32:54
Max Wasted Time = 0.2 * Build Time Wasted Time with PE = Max Wasted Time / (PE + 1) Actual Time Taken = (0.8) * Build Time - Wasted Time with PE
yes I mean PE for blueprint.. so for example if my bp has 1 day 20 hr the calculation would be:
0.2 x 44(hr)= 8.8 8.8 / (5+1)= 1.4666 'if PE 5' 44 (hr) - 1.4666 = 42.5334 (hr)
please correct me if I am wrong
- - Don't be a fool, be Relentless! Selling many BPC's and Tech2 stuff -check my bio :) |
|
Dark Shikari
|
Posted - 2006.01.10 11:51:00 -
[11]
Originally by: Da Death
Originally by: Dark Shikari Edited by: Dark Shikari on 10/01/2006 11:32:54
Max Wasted Time = 0.2 * Build Time Wasted Time with PE = Max Wasted Time / (PE + 1) Actual Time Taken = (0.8) * Build Time - Wasted Time with PE
yes I mean PE for blueprint.. so for example if my bp has 1 day 20 hr the calculation would be:
0.2 x 44(hr)= 8.8 8.8 / (5+1)= 1.4666 'if PE 5' 44 (hr) - 1.4666 = 42.5334 (hr)
please correct me if I am wrong
That should be correct -- Proud member of the [23].
The Tachikomas are DEAD! Click sig for video.
|
Da Death
|
Posted - 2006.01.10 12:29:00 -
[12]
Thanks man :D
- - Don't be a fool, be Relentless! Selling many BPC's and Tech2 stuff -check my bio :) |
Hobis
|
Posted - 2006.03.09 15:32:00 -
[13]
I've tried several formulas from this forum and finaly came up with this one that's actualy working (the one posted above was missing few things):
ProductionTime = BasteTime * (1 - IndutryLvl * 0.04)*(1 - (0.2 - 0.2 / (PE + 1)))
|
|
|
|
Pages: [1] :: one page |
First page | Previous page | Next page | Last page |