Pages: [1] :: one page |
|
Author |
Thread Statistics | Show CCP posts - 0 post(s) |
Nicola Romanoff
Reasonable People Of Sound Mind
3
|
Posted - 2014.10.27 21:27:29 -
[1] - Quote
I am struggling to find the option in the industry window that shows you the cost of setting up a job in another station, could someone please let me know how I would do this?
Thanks |
Selaria Unbertable
POS Mortem Renegades Of Silence
43
|
Posted - 2014.10.27 23:41:32 -
[2] - Quote
You can't. In order to see the costs for a specific job, the blueprint has to be present in that specific station. The job costs in stations (for the same activity and the same blueprint) in the same solar system is the same, by the way. |
Argent Rotineque
Federal Navy Academy Gallente Federation
8
|
Posted - 2014.10.28 04:16:53 -
[3] - Quote
When I install a blueprint and click on the facilities tab, and then any of the other facilities on that tab, the job cost number changes for each of the stations. Perhaps you need a few levels of scientific networking? I had that trained prior to Crius, so can't tell you whether that matters or not. |
Tau Cabalander
Retirement Retreat Working Stiffs
4284
|
Posted - 2014.10.28 06:58:24 -
[4] - Quote
Erm...
1. Right-click BPO / BPC. 2. Select "Show Info". 3. Left-click on button at the bottom "View in industry". 4. Left-click on job type: manufacturing, ME, PE, copy, etc. 5. Left-click on "Facilities" tab. 6. Left-click to select facility from the list. 7. Look at the job cost displayed.
I have level 4 in both Scientific Research and Supply Chain Management for a 20 jump range (same region), so that may be a factor.
Selaria Unbertable wrote:You can't. In order to see the costs for a specific job, the blueprint has to be present in that specific station. The job costs in stations (for the same activity and the same blueprint) in the same solar system is the same, by the way. This is incorrect.
See above. The BPO / BPC can even be selected from the market or contracts, or anywhere. |
Nicola Romanoff
Reasonable People Of Sound Mind
3
|
Posted - 2014.10.28 07:06:59 -
[5] - Quote
Tau Cabalander wrote:Erm... 1. Right-click BPO / BPC. 2. Select "Show Info". 3. Left-click on button at the bottom "View in industry". 4. Left-click on job type: manufacturing, ME, PE, copy, etc. 5. Left-click on "Facilities" tab. 6. Left-click to select facility from the list. 7. Look at the job cost displayed. I have level 4 in both Scientific Research and Supply Chain Management for a 20 jump range (same region), so that may be a factor. Selaria Unbertable wrote:You can't. In order to see the costs for a specific job, the blueprint has to be present in that specific station. The job costs in stations (for the same activity and the same blueprint) in the same solar system is the same, by the way. This is incorrect. See above. The BPO / BPC can even be selected from the market or contracts, or anywhere.
Thanks Tau, I have found that now
|
Selaria Unbertable
POS Mortem Renegades Of Silence
44
|
Posted - 2014.10.30 14:41:45 -
[6] - Quote
Tau Cabalander wrote:Erm... 1. Right-click BPO / BPC. 2. Select "Show Info". 3. Left-click on button at the bottom "View in industry". 4. Left-click on job type: manufacturing, ME, PE, copy, etc. 5. Left-click on "Facilities" tab. 6. Left-click to select facility from the list. 7. Look at the job cost displayed. I have level 4 in both Scientific Research and Supply Chain Management for a 20 jump range (same region), so that may be a factor. Selaria Unbertable wrote:You can't. In order to see the costs for a specific job, the blueprint has to be present in that specific station. The job costs in stations (for the same activity and the same blueprint) in the same solar system is the same, by the way. This is incorrect. See above. The BPO / BPC can even be selected from the market or contracts, or anywhere.
Didn't know that. I stand corrected then.
|
|
|
|
Pages: [1] :: one page |
First page | Previous page | Next page | Last page |