| Pages: [1] :: one page |
| Author |
Thread Statistics | Show CCP posts - 0 post(s) |

Iboku Kaeane
|
Posted - 2007.01.11 23:28:00 -
[1]
I've an issue wiht BPC's these days, cause i cannot judge if they are economically advantageous for me to buy or not compared to building the item myself, Since the Blueprints on the contracting market show the base Values for production instead of their effective values.
|

Reggie Stoneloader
eXceed Inc.
|
Posted - 2007.01.12 02:26:00 -
[2]
Really? I hadn't noticed. If it's the case, then it's a good point and I support it.
|

FactorzGT
Quantum Industries
|
Posted - 2007.01.12 03:08:00 -
[3]
i just bought a bpo and it showed me it was ME30 ... or were you talking about something different?
|

Iboku Kaeane
|
Posted - 2007.01.13 22:33:00 -
[4]
I'm talking about the material needed report, an ME 30 BP you see on escrow, will list the same materials needed as an ME 0 BP will when you "show info" on it, before buying, This makes it hard to evaluate the actual effective value of the BP, they will be lsited as ME 30 if they are but the Materials you will get listed will be as if the BP had never been researched, up untill you buy it. Makes it ahrd to decide if that ME 40 BP for 2 mil is actually a better offer than the ME 39 BP for 1.5 mil
|

Gen Ap
Gallente Corpus PCG
|
Posted - 2007.01.13 22:55:00 -
[5]
Originally by: FactorzGT i just bought a bpo and it showed me it was ME30 ... or were you talking about something different?
If the contract has multiple items, the show info of the BP gives the correct ME, and mineral requirements. If it's just a single item in the contract, show info shows the values of an ME 0 print.
|

HAL 9000
|
Posted - 2007.03.06 07:35:00 -
[6]
Originally by: Gen Ap
Originally by: FactorzGT i just bought a bpo and it showed me it was ME30 ... or were you talking about something different?
If the contract has multiple items, the show info of the BP gives the correct ME, and mineral requirements. If it's just a single item in the contract, show info shows the values of an ME 0 print.
So how can one be sure that a single-item BPC is not a scam? The general description of the contract may say 30 ME, but the show info, as you say, says 0 ME. Is it possible to falsify the general description?
|

Finlander09
|
Posted - 2007.03.06 08:29:00 -
[7]
Thats true... BPC show as ME0 even if its ME 1 billion.
Nice bug.
|
| |
|
| Pages: [1] :: one page |
| First page | Previous page | Next page | Last page |