|
Author |
Thread Statistics | Show CCP posts - 0 post(s) |

cosmoray
Bella Vista Holdings Corp
|
Posted - 2010.05.27 23:25:00 -
[1]
Now the horse has bolted you can't move everything back.
CCP will only be able to handle this one way (which they have done in the past), which is to nerf what the 3 oddballs reprocess into.
Most of the POS reprocessing is logical and the build requirements mainly even out (territorial claim unit/jump bridge/mobile lab all need same components).
There are 3 modules that have caused a huge issue. The fact is there will be industrialists who will reprocess enough stuff to last a year or so, making PI a waste of time to actually put anything on planet.
If you want cheap PI stuff buy it now and reprocess before the mini-patch alters reprocessing loot.
|

cosmoray
Bella Vista Holdings Corp
|
Posted - 2010.05.27 23:32:00 -
[2]
Originally by: mental maverick What would a nerf be if they decide to go that way?
More yield from extractors? That would still make POS structures ludicrously cheap wouldn't it?
No, just change what REAA, cyno jammer, cyno generator array and moon miner process into. At the moment they will be very expensive to make, but at present are cheap to buy and reprocess (relatively).
|

cosmoray
Bella Vista Holdings Corp
|
Posted - 2010.05.27 23:43:00 -
[3]
So far today:
1. About 12,000 units of Cyno System Jammer purchased in Forge region 2. About 3,000 units of Rapid Equipment Assembly Array purchased in Forge region
It would be almost impossible to wipe all the reprocessing jobs, as people have probably set up manufacturing jobs with the loot, paid the station fees for starting the jobs, market sales, etc.
Mini-nerf in what the above 2 items re-processes into coming to Eve in the next 2-3 days. The window of opportunity will close.
So market effects:
1. Price crash for most POS items initially as people clear the inventory. 2. PI will be unprofitable until inventory is cleared from this reprocessing rush 3. Market won't settle down for many months.
|

cosmoray
Bella Vista Holdings Corp
|
Posted - 2010.05.28 16:46:00 -
[4]
Making quick cash out of this patch is like a ponzi scheme, get in early and get out quickly before the authorities drop the hammer.
My PI:
100 REAA (@ 9 each) = 900M 100 cyno jammer (@ 7.2 each) = 720M 160 Cap Construction Parts (avge 5M each, some mine) = 800M 1 Large Caldari Tower BPO = 500M
Total = 2920M
20 Large Caldari Towers in production Sold all other spare P4 modules = 720M
Total spent = 2200M Caldari Tower each cost = 85M (not inc BPO)
The market for P4 parts looks to have tanked badly in the last few hrs. Sterile conduits selling for around 1M (vs 2.5M 2 hrs ago).
One of the big winners is those making cap construction parts, now selling for 15M each (production cost approx. 3.5M ISK)
|
|
|
|